① After the operation is completed, the finished products should be stacked, the site should be cleaned, and the power supply should be cut off.
②The mechanical transmission part should have a protective cover, and the electrical part should be grounded or connected to zero.
③ All kinds of machinery should be responsible for the special person, prohibit the non-operator without permission to boot.
④ Without the consent of the person in charge of the construction site, all protective facilities on the site shall not be removed and moved.
⑤ Special operators, such as CNC steel cage welder workers, should be allowed to work on the certificate, can operate the machinery.
⑥The operation personnel into the construction site must abide by labor discipline and safety production system, wear a good helmet, fasten the safety buckle.
⑦ Processing of longer reinforcement should have special help, and follow the command of the operator, shall not be arbitrary drag. The installation of construction site machinery must be solid, maintain the horizontal position, fixed machinery should have a reliable foundation, mobile machinery should be fixed in the operation of the walking wheel.